The short answer
Medical device product development runs in nine phases, from the clinical need and intended use through design, testing and the FDA submission to manufacturing and post-market surveillance. In the four OVA proposals that priced the whole path from an idea or early prototype to a production-ready design, the engineering came to 4,000 to 6,000 hours, and our cost calculator puts that path at about 6 to 12 months for a typical Class II device. FDA review, any clinical study and the scale-up to volume production come on top.
The phases, from idea to production
This new product development process follows the order of decisions in Hardware Bible, Lisa Voronkova’s book. It holds for any medtech or biomedical device, and for healthcare product development in general; the device class only changes how much evidence each phase needs.
- Clinical need and intended useWho uses the device, where, and why.
- Regulatory route and payerThe class, the FDA pathway and who pays.
- Concept and feasibilitySeveral concepts, and the riskiest physics tested.
- Design and prototypesElectronics, firmware and mechanics, built in rounds.
- Design controls and riskThe design file and the risk file, kept as you go.
- Verification and validationProof against the specifications and the user needs.
- Clinical evidence and submissionA study only if your claims need one, then FDA.
- Transfer and pilot buildA process a factory can repeat.
- Launch and post-marketHospital sales and the loop back into design.
1. Clinical need and intended use
Everything starts with a need written in one sentence that names the patients, the problem and the outcome you will change. Hardware Bible asks eight questions here, from who will use the device and where to why users will prefer it to the alternatives, and the answers become the user needs document and the intended use statement. Write that statement before the first prototype, because its wording decides the device class.
At OVA this sits in discovery, 3 to 8 weeks and 100 to 336 engineering hours (median about 180), which ends with requirements, an architecture, a risk list and an estimate for the next phase. The mistake the book meets most often is what it calls “the technology looking for a problem”. The free development readiness check shows where your project has gaps.
2. Regulatory route and who pays
The class and the pathway set your timeline, budget and evidence, so they are design inputs from the first week. Most Class II devices reach the US market through a 510(k), FDA’s premarket notification, which shows that the device is substantially equivalent to one already sold, the predicate. A new low to moderate risk device with no predicate goes through De Novo classification, and most Class III devices need premarket approval (PMA). FDA clears a 510(k), grants a De Novo request and approves a PMA; the FDA class and pathway finder and the 510(k) clearance time by product code tool show where devices like yours landed.
Payment is a separate question, and Lisa has seen “more good devices die of a missing billing code than of a failed test.” The phase ends with a short regulatory and commercial strategy. One founder in the book learned the route too late, after three years and $4 million, when it turned out to require a randomized trial.
3. Concept and feasibility
Concepts are generated in numbers and killed against criteria written in advance. The book scores each problem from 1 to 10 on frequency, severity, workaround difficulty and willingness to pay and drops anything whose product is under 1,000, and Wizard of Oz tests, where a person stands in for a function the device will automate, check usability before anyone pays for electronics.
When one physics question decides the device, OVA proposals price a feasibility gate at 400 to 1,000 hours, typically 400 to 560. The phase ends with a concept definition and a candid feasibility assessment. The book puts early technical feasibility at $50,000 to $150,000, a good fit for SBIR and STTR grants (federal small business research funding), and the SBIR and STTR fit check shows whether you can apply. The common mistake is settling on the first solution that works instead of testing three different approaches against each other.
4. Design and prototypes
Electronics, firmware and mechanics are designed together, in prototype tracks that each answer one written question about feasibility, clinical use, usability or manufacturing. In OVA proposals, design and the first prototype took 700 to 1,600 engineering hours and each further round 200 to 1,000, and taking a concept or proof of concept to 3 to 10 working prototypes, without design for manufacturing, came to 1,000 to 2,500 hours across eight proposals. A cellular radio on a battery got its own phase of about 500 hours in the one proposal that had it; the wearable battery life calculator checks a power budget against datasheet currents.
The usual mistakes are processes that will never scale and patient-contact parts in materials that differ from production. The phase ends with working prototypes and a golden sample, the pre-certification unit that becomes the reference for production.
5. Design controls and risk management
Design controls are the rules for how you develop the device itself: user needs become measurable design inputs, outputs are checked against them, and reviews sit between stages. Since February 2, 2026, FDA’s Quality Management System Regulation (QMSR) has incorporated ISO 13485:2016, the international quality standard for medical devices, and its design clause covers Class II and III devices and Class I devices automated with software. Risk management under ISO 14971, the risk standard, runs alongside.
OVA proposals for medical programs put documentation and verification preparation at 400 to 1,250 hours, 15% to 31% of the hours in the four Class II and sterile proposals that broke it out. You walk away with a design and development file (the old design history file), a traceability matrix that links each need to its tests, and a risk file. The book warns against backfilling, writing the records after the device is built. For a device with software that can reach the internet, the cyber device check shows whether section 524B, FDA’s cybersecurity law for connected devices, applies.
6. Verification and validation
Verification shows that the design meets its specifications; validation shows that the device meets users’ needs in realistic use. Verification usually covers:
- electrical safety to IEC 60601-1, the standard for medical electrical equipment
- electromagnetic compatibility (EMC) to IEC 60601-1-2
- biocompatibility to ISO 10993, on the finished, packaged and sterilized device
- software to IEC 62304, the software life cycle standard
Approve acceptance criteria before each test and justify the sample: 59 passing units support 95% reliability with 95% confidence. For the summative human factors study, the formal test of real users on the final design, FDA recommends at least 15 participants from each distinct user group, none of them your employees. The book plans 6 to 12 months for this testing on a moderate-risk device, and the mistake it names is writing pass criteria after the data comes in.
7. Clinical evidence and the submission
Most 510(k) devices are cleared on bench, animal, software and usability data; De Novo devices often need a clinical study, and a PMA almost always does. If you need one, match each claim to an endpoint and ask FDA through a Pre-Submission (Pre-Sub), its written feedback program, before you lock the protocol. The book allows 12 to 36 months for a study and warns against starting one before the bench work is done.
A 510(k) received in fiscal year 2025 took 141 calendar days on average to a decision, 76 FDA days plus 66 days of the company’s own time (510(k) review times), and recent De Novo requests averaged 248 to 278 days (De Novo review time). For FDA’s fiscal year 2027 the 510(k) fee is $28,653, or $7,163 for a qualified small business; the FDA user fee calculator adds up the rest.
8. Transfer to manufacturing and the pilot build
A prototype proves function. Production needs an assembly sequence, tolerances, test points, fixtures, second sources and a cost target, and each can change the design. Design transfer turns design outputs into production specifications, and the pilot build proves the process, with installation, operational and performance qualification (IQ, OQ and PQ) for steps you can’t fully check afterward, such as a seal.
Three OVA proposals put design for manufacturing, transfer and the pilot build at 1,000 to 2,300 hours; Lisa’s published breakdown puts design for manufacturing for an average product at 2,500 to 4,000. The book’s warning is to start the pilot before the submission, because one startup with a cleared, hand-built device lost 9 months to redesign. OVA builds batches of up to 200 units and hands volume production to your contract manufacturer; the cost calculator shows design for manufacturing as its largest single phase.
9. Launch and post-market surveillance
Clearance lets you sell a device; it doesn’t make a hospital buy it. The book maps everyone who can say no, from the value analysis committee that approves new products to IT security and the lead nurse, and allows 3 to 6 months for launch preparation.
Many teams treat launch as the finish line, but surveillance starts with the first unit shipped. A remark about a malfunction made to a sales rep in a corridor is a complaint, and if it suggests a death or serious injury, FDA’s Medical Device Reporting rules give you 30 calendar days to report. Post-production support runs 200 to 400 engineering hours a year in OVA’s published project sizes. A legacy device sold in the EU under an old directive certificate keeps its transition period only without significant changes; the EU MDR transition deadline check shows its end date.
Engineering hours by phase
The phase estimates below come from OVA’s hours benchmark, 35 proposals written from July 2024 to October 2026. They are estimates made before the work, not hours spent, and they exclude materials, test labs and FDA fees. The cost calculator turns hours into a budget: at $125 per hour, 1,000 hours cost $125,000.
| Phase | What you walk away with | Engineering hours (OVA benchmark) |
|---|---|---|
| 1. Clinical need and intended use | User needs, intended use; requirements, architecture and risk list from discovery | 100 to 336 for discovery (median about 180) |
| 2. Regulatory route and payer | Class, pathway, predicates, payment codes | Depends on device |
| 3. Concept and feasibility | Concept definition, feasibility assessment | 400 to 1,000 for a feasibility gate (typically 400 to 560), only when one physics risk decides the device |
| 4. Design and prototypes | Working prototypes, then a golden sample | 700 to 1,600 for design and the first prototype; 200 to 1,000 per further round |
| 5. Design controls and risk | Design and development file, traceability matrix, risk file | 400 to 1,250 for documentation and verification preparation (15% to 31% of a Class II or sterile program) |
| 6. Verification and validation | Verification, validation and human factors reports | In the row above; lab tests are paid separately |
| 7. Clinical evidence and submission | Study data where needed, engineering part of the submission | Depends on device |
| 8. Transfer and pilot build | Production specifications, validated processes, pilot units | 1,000 to 2,300 (adds about 30% to 60% on top of the prototype work, 2 proposals that priced it separately) |
| 9. Launch and post-market | Complaint, reporting and field action procedures | Depends on device |
| Project management, all phases | Plans, coordination, reviews | 6% to 18% of hours, usually 10% to 15% |
What changes with the device class
Class I devices are mostly exempt from premarket review and from design controls, apart from devices automated with software and a few named types (21 CFR 820.10(c)), but they still need registration, listing and FDA’s general controls. Class II, the case this page follows, usually goes through a 510(k), or De Novo without a predicate. Class III usually means a PMA with a clinical study as the main evidence and an FDA inspection of manufacturing before approval, and in OVA’s calculator it adds documentation, verification and prototype rounds. Some general wellness products fall outside FDA’s device definition or its active oversight, and FDA revised that guidance on January 6, 2026, so get a regulatory opinion if your product sits near the line. In OVA’s proposals, wellness demonstrators carried no design controls or regulatory documentation, and the one wellness redesign that included compliance preparation put about 8% of its hours there.
What OVA does here, and where our responsibility ends
We design the electronics, firmware and mechanics of medical devices and take them from concept to design for manufacturing. We are not a regulatory consultancy and not a contract manufacturer: the regulatory strategy and the submission stay with you or your regulatory consultant.
This page is an orientation, not a regulatory opinion. Confirm the pathway with a regulatory specialist or through a Pre-Submission (Q-Sub) with FDA. The free tools linked here run in your browser. Your answers are not sent to us; with your cookie consent, Google Analytics records only that a tool was used and the category of the result.
Questions
How long does medical device product development take?
OVA’s cost calculator puts the engineering from an idea to a production-ready design at about 6 to 12 months for a typical Class II device, with a dedicated team of 3 to 5 engineers. The whole program takes longer: in Hardware Bible the phases add up to about three years for a simple device with no clinical study and about ten with a large trial.
How much does it cost to develop a medical device?
For a Class II device that reads body signals, runs on a battery, talks over Bluetooth and needs 3 to 5 prototypes, the cost calculator puts the engineering from an idea to a production-ready design at 4,340 to 6,040 hours, or $545k to $755k at $125 per hour. Materials, test labs, FDA fees, clinical studies and tooling come on top.
Who does what in a medical device program?
You and your regulatory consultant own the intended use, the regulatory strategy and the submission, and you run any clinical study as sponsor. An engineering firm such as OVA designs the device, builds prototypes and small batches and prepares the engineering side of the submission. Labs run the formal tests, and a contract manufacturer takes over volume production.
When should you talk to FDA?
Before you lock a test plan or a clinical protocol, through a Pre-Submission. FDA gives written feedback within 70 days, and the book advises planning on 3 months or more from submission to answers. If the class itself is unclear, a 513(g) request for classification information gets FDA’s view within 60 days, for $8,596 in FY2027 or $4,298 for a small business.
Can a startup develop a device with an outside engineering team?
Yes. A device needs at least a mechanical, an electronics and a firmware engineer plus someone who owns quality and documentation, and hiring them before the product exists commits most of a seed round to salaries. Buy the work in phases, each with a budget ceiling and a deliverable, and make sure you own the design files and source code.
Related pages
Sources
- Lisa Voronkova, Hardware Bible: Build a Medical Device from Scratch, revised edition 2026, on Amazon
- OVA Solutions, Medical device development in hours: what 35 proposals and 70 founder calls show, October 2026
- OVA Solutions, Medical device development cost calculator (35 OVA estimates, 2024 to 2026)
- OVA Solutions, 510(k) review times in 2026 (FDA data compiled October 2026)
- OVA Solutions, De Novo review time, grant rate and fees (FY2027)
- FDA: Quarterly Update on Medical Device Performance Goals, MDUFA V, actions through June 30, 2026
- FDA: MDUFA Performance Goals and Procedures, Fiscal Years 2023 Through 2027
- Federal Register: Medical Device User Fee Rates for Fiscal Year 2027, July 30, 2026
- FDA guidance: Requests for Feedback and Meetings for Medical Device Submissions, the Q-Submission Program, May 2025
- Federal Register: Quality System Regulation Amendments, final rule, 89 FR 7496 (QMSR, effective February 2, 2026)
- 21 CFR 820.10(c), design and development requirements by device class (eCFR)
By Lisa Voronkova, CEO of OVA Solutions. Updated on October 23, 2026.