US medical device companies can work with engineering teams in Ukraine and Eastern Europe for electronics, firmware, mechanical design and full device development, as long as the team works under a medical quality system and the contract gets the IP right. OVA Solutions is one of these firms: a medical device development company with an engineering team based in Ukraine and a New York presence. We have about 62 engineers, we’re ISO 13485 certified, and we’ve developed 220 devices in 11 years, Class I to III, from concept through FDA submission.
I’m Lisa Voronkova, CEO of OVA Solutions. Other firms in the region do this work too, and you should talk to more than one. This article covers what I’d want to know as a US buyer, including about us.
Is Ukraine a good place to outsource medical device engineering?
It’s a real engineering market. In 2025 Ukraine exported $6.66 billion in computer services, up 3.3%, which was 41.6% of all its services exports. The US was the biggest buyer at $2.39 billion, about 36%. The IT Research Ukraine 2025 study counted 303,000 IT specialists, 245,000 of them in Ukraine, and 2,062 verified IT companies.
Those numbers are about software and IT services in general. Medical devices are a narrower field. Hardware, firmware for regulated devices and design files that hold up in an FDA submission need people who’ve done it before. So look at the market size as a sign that the talent pool exists, and then judge each team on its own medical work.
What about time zones?
Kyiv is normally 7 hours ahead of US Eastern time. When it’s 9:00 in New York, it’s 16:00 in Kyiv. For a few weeks around the clock changes in spring and autumn the gap drops to 6 hours, because the US and Ukraine don’t switch on the same dates. In 2026 Ukraine was on summer time from March 29 to October 25.
In practice your morning is the team’s afternoon. That’s enough for a daily call and a design review. For the West Coast the gap is about 10 hours, so the overlap is your early morning.
The other side of the gap is useful. You send a question at the end of your day, and the engineers have been working on it for hours by the time you’re back. For hardware, where a board revision or a bench test takes real time, that rhythm works.
We also have a New York presence, so contracts and escalations aren’t limited to Kyiv hours. And in 2026 we’re opening an office in Florida and hiring engineers there.
How do you protect IP with an engineering team in Ukraine?
Two layers, and you need both.
On the Ukrainian side, Law No. 1667-IX from 2021 says that an employer owns software and databases created by employees within their duties, and that a customer owns copyrighted works, including software, created for it under a contract. These defaults are about software and other copyrighted works, so cover hardware designs and inventions in the contract. And don’t rely on defaults even for software. Make sure your vendor’s employment contracts with its engineers actually transfer the rights to the vendor, so the vendor has something to transfer to you.
On the US side, the wording matters. Use a present assignment, “hereby assign,” and not “agree to assign.” In the Stanford v. Roche dispute, the Federal Circuit held that a “do hereby assign” clause beat an earlier “agree to assign” promise, and the Supreme Court left that ruling in place in 2011. Pair work-made-for-hire language with the assignment so you’re covered both ways.
And keep the source yourself. Your repository, your CAD, your PCB source files. If a vendor relationship ends, you should be able to hand everything to someone else the next week.
Does an offshore team need ISO 13485?
If the work goes into a medical device you’ll submit to the FDA, I’d say yes. Since February 2, 2026 the FDA’s Quality Management System Regulation (QMSR) incorporates ISO 13485:2016 by reference. A vendor working under ISO 13485 is working under the same structure the FDA now inspects you against.
OVA is ISO 13485 certified, and our certificate is valid through October 2028. When you ask any vendor for theirs, check the scope and the dates. A certificate for “electronics manufacturing” isn’t the same as one for medical device design and development.
How is the work organized day to day?
For one product we usually have a team of 3 to 5 engineers and 400 to 600 engineering hours a month. We price each phase as a fixed fee agreed before it starts. For planning, our estimates use $125 per engineering hour, so a product in active development runs at roughly $50,000 to $75,000 of engineering a month. Engineers own specific parts of the device: electronics, firmware, mechanics.
With AI in our process, we take a device from zero to design for manufacturability in about six months, and about twelve for complex proprietary devices.
Real examples help more than rates. A powered rehabilitation chair (electronics and firmware for a Class II device on the 510(k) route) took about 2,100 hours over 16 weeks, around $260,000, and ended with five pre-production units and a submission-ready design and development file. A laptop-sized portable ventilator took about 22,000 engineering hours, went through animal trials and then clinical trials, and is now on the market. A drug delivery device took about 6,000 hours from idea to a production line.
Physical prototypes move too. A client’s light-therapy lamp shipped to our New Jersey warehouse and then on to the engineering team for an alpha evaluation. Hardware outsourcing works when the hardware can actually get to the people working on it.
Who pays for this?
Before you hire any team for months of development, someone should answer who uses the device, who buys it and who pays for it. That’s what our Device-to-Market Blueprint does: 4 to 6 weeks, $25,000 fixed, 100% credited to development if you sign within 90 days. It also covers the FDA path, unit economics and a test of the riskiest subsystem. It’s a smaller first step for testing any team, ours included, before a big commitment.
Can a Ukrainian team keep working during the war?
You should ask this directly, and any vendor should answer it directly.
The war is real and it affects work. The IT Research Ukraine 2025 study found that 75% of verified IT companies have staff who were mobilized. There are air alerts and power outages. I’m not going to give you a resilience percentage, because I don’t have a credible one.
Ask any Ukrainian vendor, us included, exactly how they handle power outages, connectivity and a mobilized engineer, and judge the answer by how specific it is.
What matters for you as a client is that knowledge doesn’t live in one person’s head. Written requirements, a risk file, a repository that builds, test procedures on paper. That’s good practice in any country, and in a war it’s what keeps your project moving when one person is out.
What should you ask any Eastern European device engineering vendor?
Here’s the list I’d use, including for us.
- Can you show medical devices you’ve taken to production or to an FDA submission, with hours and team size?
- What does your ISO 13485 certificate cover, and when does it expire?
- Does your contract use “hereby assign” for IP, and do your employee contracts transfer rights to the company?
- Who is my day-to-day contact, and what are their working hours in my time zone?
- Where will my physical prototypes be shipped, built and tested?
- How do you handle firmware for compliance (risk management, documentation), not only for function?
- If an engineer is unavailable, who covers, and where is that knowledge written down?
- Can I get the full source, CAD and PCB files at any point?
If the answers are specific, you’re talking to a team that’s done this. If they’re vague, keep looking.
If you’re comparing engineering teams for your device and want to hear our answers to that list, book a call.
First published on LinkedIn on November 6, 2026.
Related pages
Sources
- timeanddate.com, Ukraine clock changes 2026
- IT Cluster Lviv, what tech services exports looked like in 2025
- Scroll.media, IT Research Ukraine 2025
- Avellum, Diia City law in Ukraine and IP
- Orrick, IP assignments from software developers
- Cornell LII, Stanford v. Roche, Supreme Court 09-1159
- FDA, Quality Management System Regulation (QMSR)
More on this topic: Cost, Funding & Market