A stalled medical device project can be picked up by an engineering firm that does full-cycle device development and is willing to start with an audit, not a redesign. OVA Solutions is a medical device development firm that takes devices from concept through FDA submission (Class I to III, ISO 13485 certified), and we’ve revised existing devices and ported legacy firmware instead of starting from zero. Before anyone quotes the rest of the work, it’s worth spending about two weeks checking what actually exists, because what exists is rarely what the slide deck says.
I’m Lisa Voronkova, CEO of OVA Solutions. This is the list I’d work through, and why each item is on it.
Who can take over a stalled medical device project?
Any team can open the files. Fewer teams can tell you within two weeks whether the files are a foundation or a liability.
You need three things from whoever takes over. They need to have built complete devices, so they can see what’s missing and not just what’s broken. They need a quality system, because from February 2, 2026 the FDA’s Quality Management System Regulation (QMSR) is in force, and it incorporates ISO 13485:2016 by reference. And they need to be comfortable working on someone else’s decisions without rewriting everything to their own taste.
That last one matters more than founders expect. On one project we revised an existing electrocardiograph (STM32 microcontroller, ADS1298 analog front end, defibrillation and ESD protection) for a new version of the device. The client’s own software had to stay untouched. So the new hardware had to hand that software exactly what it expected. Respecting what already works is part of a takeover.
What should you check first when you inherit a device project?
Here’s what I’d go through. The first week is mostly files, the second mostly the bench.
- The design and development file. Under QMSR the FDA dropped the term “design history file” and treats the ISO 13485 “design and development file” as the equivalent. Check if it exists at all, if design reviews were recorded, and if anyone could reconstruct why the design looks the way it does.
- The requirements trace. Every requirement should lead to a design decision, a test and a result. Most stalled projects have requirements and tests. The links between them are what’s missing.
- The risk file. QMSR explicitly requires risk management. A hazard list written once at the start and never updated is a document, not a risk file.
- The BOM and obsolete parts. Check the lifecycle status of every part. A board designed three years ago can have a key part that’s no longer made, and then “finish the project” means redesign the board.
- Firmware that builds from the repo. Take the repository, set up a clean machine and try to build it. If the binary on the prototype can’t be rebuilt from what’s in version control, nobody really owns that firmware.
- Test fixtures. Who has them, do they work, and are the test procedures written down or in one engineer’s head.
- Supplier status. Which suppliers made the prototypes, what was agreed, and whether anyone qualified them. Supplier audit reports are no longer exempt from FDA inspection under QMSR.
- The regulatory path. Is the device class decided, is there a predicate if it’s a 510(k), and does the intended use in the documents match what the founder says in meetings.
Why does the firmware have to compile on day one?
Because firmware is where the most hidden work lives.
On one ECG device, the legacy firmware lived in IAR Embedded Workbench. We ported it to STM32CubeIDE and refactored the code during the migration, to bring the architecture up to date with the STM32 ecosystem. A port like that is normal engineering. What you want to know early is whether a port is needed, because it changes the plan.
There’s a second question, and it’s bigger. Is the firmware functional, or is it compliance-ready? Those are two different deliverables. On an AI stethoscope we wrote the functional firmware. A separate US company then took about two years to rework it into compliance-ready software, including risk management. The code worked. But code that works and code you can put in a submission are separated by documentation, risk analysis and verification. The current edition of the medical software standard IEC 62304 is 2006 with Amendment 1 from 2015, and it expects that process to exist, not to be written after the fact.
So with inherited firmware, ask which of the two you’re getting. Founders usually think they have the second one.
Should the physical prototype be shipped to the new team?
Yes, if it can be. Photos and drawings tell you what the device was supposed to be. The unit on the bench tells you what it is.
Take a client’s existing prototype, a floor-standing light-therapy lamp with infrared and red LEDs. It shipped to our New Jersey warehouse and then to the engineering team. Our proposal had four phases: alpha evaluation, beta design, pre-production and manufacturing documentation, about 1,400 to 1,520 hours over 8 to 10.5 months.
The most useful finding wasn’t on a circuit board. Our CTO’s read was that the hard part of that lamp is the UX and the industrial design, not the electronics. If we had quoted from the schematic alone, we would have put the hours in the wrong place.
How much does it cost to fix a mistake you inherit?
More the later you find it. Engineers at NASA’s Johnson Space Center estimated this for large aerospace systems (Stecklein and colleagues, 2004). If fixing a requirements error during the requirements phase costs 1, fixing the same error costs 3 to 8 in design, 7 to 16 once it’s built, 21 to 78 in integration and test, and from 29 to more than 1,500 after it’s in operation.
That’s aerospace data, and medical devices aren’t spacecraft. But the logic is the same. A stalled project usually sits somewhere in the middle of that table. Every week spent building on top of an unchecked requirement moves the cost of fixing it to the right.
Design files are also where FDA inspectors look hard. In FY2022 design controls were the second most cited area in Form 483 inspection observations, at 12.32% of cited clauses, right behind CAPA at 12.42%. From February 2026 FDA inspections run under Compliance Program 7382.850 instead of the old QSIT approach. If your inherited file has gaps, the cheapest time to find them is now, by your own team, and not later by an inspector.
What if the project stalled for a business reason?
A stalled project can have a technical symptom and a business cause. The board doesn’t work, but the real problem is that nobody can say who buys the device or what it should cost to make.
Who pays for this? If that answer is missing, more engineering won’t unstall the project. That’s why we built the Device-to-Market Blueprint: 4 to 6 weeks, $25,000 fixed, 100% credited to development if you sign within 90 days. It answers who uses the device, who buys it, who pays for it, the FDA path and the unit economics, and it includes an engineering test of the riskiest subsystem. For an inherited project, that test is often the first real look at whether the core of the device works.
What happens after the first two weeks?
You get a written picture of what exists, what’s missing and what has to be redone, with hours against each item. Then you decide. Sometimes the answer is to finish what’s there. Sometimes it’s to keep the parts that work, like the client’s software on that ECG device, and rebuild around them. Once in a while it’s cheaper to start the hardware again from clean requirements.
With AI in our process, we take a new device from zero to design for manufacturability in about six months, and about twelve for complex proprietary devices. A takeover can be faster or slower than that, depending on what the two weeks find. That’s the point of doing them first.
If you’re sitting on a project that stopped moving, book a call and we’ll tell you what we’d check first.
First published on LinkedIn on November 13, 2026.
Related pages
Sources
- FDA, Quality Management System Regulation (QMSR)
- Ropes & Gray, top 10 takeaways from FDA’s revised quality system requirements
- Pharmaceutical Online, the most cited QSR clauses in FDA FY2022 medical device inspections
- Stecklein et al., Error Cost Escalation Through the Project Life Cycle, NASA JSC, 2004
- VDE, IEC 62304 edition 2 changes
More on this topic: Cost, Funding & Market