If you’re moving medical device development or manufacturing engineering out of China, you need a team that can take over the design files, rebuild the bill of materials with alternates, recreate the test fixtures and run supplier qualification and process validation again. OVA Solutions is a medical device development firm (Class I to III, concept through FDA submission, ISO 13485 certified) with a New York presence and an engineering team based in Ukraine, and that is the engineering we can take over. We also offer to make parts in Ukraine as an alternative to China.
I’m Lisa Voronkova, CEO of OVA Solutions. This article is about what actually has to move, and how long it really takes.
Why are US medical device companies moving work out of China?
Mostly tariffs and policy risk, and some security questions. The facts change often, so here they are with dates.
The four-year review of the Section 301 tariffs on China raised several medical rates. Syringes and needles went to 100% on September 27, 2024. Enteral syringes went to 100% from January 1, 2026. Rubber medical and surgical gloves went to 50% in 2025 and 100% from January 1, 2026. Respirators and face masks went from 25% to 50% from January 1, 2026. Semiconductors went to 50% from January 1, 2025. That rate applies to chips imported as chips, so check your components and boards with your customs broker.
Then the broader tariffs moved. On February 20, 2026 the Supreme Court struck down the IEEPA tariffs in Learning Resources v. Trump, 6 to 3. A 10% global tariff under Section 122 followed. That expired on July 24, 2026 and was replaced by Section 301 “forced-labor” tariffs: 10% for 17 countries and 12.5% for 38 others, China included. Goods covered by Section 232 are exempt. How these stack with the existing China rates on your specific product is a question for your customs broker, not for a blog post.
Section 232 matters for devices too. An investigation into medical devices and PPE opened on September 2, 2025. As of October 28, 2026 it was still open, and no device tariff had been imposed. That’s the kind of open question that makes a single-country supply chain hard to plan around.
There’s also federal procurement. The BIOSECURE Act was signed on December 18, 2025 as part of the FY2026 NDAA (Section 851). It bars federal procurement of biotechnology equipment and services from “biotechnology companies of concern.” It doesn’t explicitly name medical devices. If you sell to federal buyers, read it with your lawyer anyway.
And there’s security. On January 30, 2025 the FDA issued a safety communication about the CMS8000 patient monitor made by Contec Medical Systems, a manufacturer based in Qinhuangdao, China (and the relabeled Epsimed MN-120). The FDA said the software included a backdoor and that the monitor sent patient data outside the healthcare environment. The FDA updated the notice on July 2, 2025 after a patch that removed the networking function. The lesson for any device company is simple: know who wrote your firmware, and hold the source code yourself.
What has to transfer when you move device development?
This is where most founders underestimate the job. A device is a lot more than a set of Gerber files. Here’s what we ask for before we can take over.
- Design files you can edit. Native CAD and PCB source, not just PDFs and STEP exports. If you only have outputs, someone has to redraw.
- Firmware source and a working build. The full repository, the toolchain version, and proof that the binary on your device can be rebuilt from it.
- The BOM with alternates. Every part with manufacturer part numbers and approved second sources. A BOM built around local parts can be hard to buy in the US or Europe.
- Test fixtures and test procedures. The physical fixtures, their drawings and the written procedures. Without them you can’t prove the new build matches the old one.
- Supplier qualification records. Who supplied what, how they were qualified and what was agreed.
- Process validation. Molding, assembly, sterilization or bonding processes that were validated at the old supplier have to be validated again at the new one.
- The design and development file. Requirements, risk analysis, verification results. Under the FDA’s QMSR, in force since February 2, 2026, this is the record that shows the device still matches what was cleared.
If your current partner can’t or won’t hand over one of these, find out now. That gap is the real size of your project.
How long does it take to move a medical device supplier?
Longer than people want. AdvaMed has warned that changing a supplier can take years and substantial revalidation and quality-system work. I won’t put a percentage or a month count on it, because it depends on the device, its class and what changes.
What I can tell you is where the time goes. Every new supplier has to be qualified. Every validated process has to be validated again on new equipment with new people. Every changed part has to be checked against the requirements and the risk file, and you have to document whether the change affects your clearance. For a powered device, a different component can mean repeating electrical safety or EMC tests. None of that can be skipped by working harder.
So be straight with your board and investors. Moving out of China is a project with its own plan and budget, not a purchase order sent to a new factory.
Who pays for this?
You do, twice. Once in engineering hours for the transfer, and again in unit cost if the new supply chain is more expensive.
That second part decides whether the business still works. If the hospital or the insurer pays a fixed amount for your device, a higher unit cost comes straight out of your margin. For devices that aren’t on the market yet, this is one of the things our Device-to-Market Blueprint checks: 4 to 6 weeks, $25,000 fixed, 100% credited to development if you sign within 90 days. It covers who buys the device, who pays for it, the FDA path and unit economics, so the supply chain decision is made with real numbers.
Can medical device parts be made in Ukraine instead of China?
Yes, and we offer it. In 2026 we offered to manufacture parts in Ukraine for a client’s light-therapy lamp, as an alternative to China.
I’ll be direct about what that means. Ukraine is a country at war. If you make parts there, plan for it: a second source for critical parts, some buffer stock, and documentation good enough that another supplier could pick the work up. Those are good rules for any single-country supply chain. China is a single-country supply chain too, which is why many of you are reading this.
The advantage of making parts close to the engineering team is that the people who designed the part can see it being made, change it and test it without a two-week shipping loop. We have a New Jersey warehouse, so physical prototypes from US clients can ship there first.
What should you do first?
Start with an inventory before you call a new supplier. List what you have, what your current partner holds and what nobody has. Then decide what to move first. Often that’s the firmware and design files, because they’re the easiest to lose and the hardest to recreate.
We take devices from zero to design for manufacturability in about six months with AI in our process, and about twelve for complex proprietary ones. A transfer of an existing device is a different kind of project, and its length depends on what the inventory shows.
If you’re planning a move out of China and want to know what it really involves for your device, book a call.
First published on LinkedIn on November 23, 2026.
Related pages
Sources
- White & Case, United States finalizes Section 301 tariff increases on imports from China
- Medical Economics, what the Supreme Court tariff ruling means for medtech and device costs
- Fennemore, new U.S. tariffs replace expiring Section 122 tariffs
- SPS Commerce, Section 232 medical device tariffs
- Baker McKenzie, the BIOSECURE Act becomes law
- FDA safety communication, cybersecurity vulnerabilities in certain patient monitors from Contec and Epsimed
- FDA, Quality Management System Regulation (QMSR)
More on this topic: Manufacturing & DFM